01
Part definition
- Current drawing revision and part number
- 3D CAD and 2D drawing where available
- Critical dimensions, GD&T and inspection method
- Intended use, including any safety or regulatory context
Buyer resource
Use this before requesting quotations so every supplier responds to the same part, quantity and evidence requirements.
Comparison structure
A low price is difficult to evaluate when revision, exclusions, sample evidence or shipment scope differ. Record each response against these five areas.
| Area | Align before quoting | Decision record |
|---|---|---|
| Specification | Revision, grade, tolerances, finish | Assumptions and exceptions recorded |
| Sample | Quantity, cost, approval evidence | Comparable sample scope |
| Production | Quantity breaks, setup, lead time | Like-for-like commercial view |
| Quality | Traceability and inspection records | Evidence status and open questions |
| Handover | Start conditions and shipment scope | Risks, owners and next actions |
This is an illustrative buyer checklist. It does not certify a supplier or replace qualified engineering, testing or regulatory review.
Your contact
Ccunntr Sourcing · Xi'an, China
Niu Yong is the operating contact for Ccunntr. He coordinates requirement clarification, supplier comparison, sample communication and evidence tracking. Ccunntr is an independent sourcing coordinator; manufacturing is performed by the supplier selected by the buyer.
ccunntr@gmail.com